The smart Trick of Soil Resistivity Analysis BD That Nobody is Discussing
Therefore it is highly desirable to get 2 to 3 traverses centred at distinct spots. Furthermore, whose utmost probe spacing (concerning adjacent probes) reaches a length that exceeds the maximum extent from the substation.GeoTech Engineering Constrained (GEL) is a leader in geotechnical engineering in Bangladesh, providing in depth services for dev